CASA PROVIDENCIA URGENT WORK ITEMS

CLICK TO DONATE

 

  1. Main Roof Completion ($45,000)

    Remove and power wash all roof tiles

    Remove all existing tar paper

    Repair damaged wood sheeting and structural components

    Install new water barrier membrane on entire roof

    Install gutters

    Install flashing

    Install roof tiles

  2. Front and Side Roof Completion ($15,000)

    Treat and varnish all necessary wood components

    Install concrete columns

    Install wood components

    Install water barrier membrane

    Install gutters

    Install flashing

    Install roof tiles

  3. Front Emergency Stairs and Wheelchair Ramps ($25,000)

    Review plans and create diagrams

    Purchase necessary steel and concrete

  4. Side Wheelchair Ramp Building ($80,000)

    Review plans and create diagrams

    Purchase necessary steel and concrete

  5. Back Retaining Wall Construction ($15,000)

    Purchase necessary steel and concrete

    Rent soil auger adapter for backhoe

    Rent backhoe with operator

  6. New Fence and Gate Installation ($20,000)

    Review plans and create diagrams

    Purchase steel and concrete

  7. Exterior Painting ($5,000)

    Rent sandblaster to prepare walls

    Purchase paint and equipment

  8. Landscaping ($17,000)

    Purchase grass and plants

    Purchase topsoil

  9. Utility Fence on Lower Roof Sections ($1,000)

    Create diagrams

    Purchase materials

URGENT FINANCIAL NEEDS

As I write I can hardly believe that the 2015 dry season (Jan - April) is yet halfway gone. God has provided miraculously thus far in the remodel work on the building, yet there are several crucial exterior work items that remain undone, those of which we greatly desire to complete before the 2015 dry season ends.  In Colon, Panama (location of Casa Providencia) it rains 15 ft/year! Therein lies the urgency to complete the below listed work items asap; the ROOF COMPLETION and other highlighted items being of utmost importance.